December 9, 2025

Frontier Building
2950 Southwest 27 Avenue
Miami, FL 33133

Attn: Dylan Denzik
DDenzik@frontierbuilding.com
305-692-9992
813-435-0399-C

Re: Sarasota Square Retail A-D, Sarasota, FL

Revised Price Correction, Plumbing SCOPE OF WORK

Plumbing Plans, P000, P101, P102, P103, P104, P105, P106, P107, P108, and P200,
Dated 07/29/25.

Inclusions

3 FCO
1 FD-1
12 HB-1
16 RD-1
6 WM
1 WS-1
13 YCO-1

Material

DWV (Sanitary and Storm) piping to be SCH 40 PVC pipe and fittings.
Domestic water piping above and below to be CPVC pipe and fittings.
Domestic Hot water to be insulated.

Exclusions

• Booster pump
• Grease Traps
• Any dewatering
• Any Roof work of any kind
• Any Structural work of any kind.
• Any Housekeeping pads.
• Any Ceiling work of any kind.
• Any Fireproofing
• Any X-ray of any kind
• Any Painting.
• Any Concrete work of any kind.
• Any Demolition work.
• Composite Labor, Broom sweep of floors & Dumpster charges.
• Drywall access doors for ceilings or walls.
• Protection of Fixtures & Equipment following installation.
• Buy America Act domestic requirement.
• Overtime, premium time, & shift work
Note: Opening of ceilings, walls, and floors by others.

This proposal is Firm for thirty (30) days.

Price

$155,200.00

Add for TD-1(51’) TD-2 (26’)

$24,400.00

Add for using Copper

$21,600.00

Total Price

$202,200.00

Respectfully,

David Crosby
Plumbing Estimator
Estimating@bbproplumbing.com

Managed By Cassus Media