July 16, 2025

T.D. Farrell Construction, Inc.
530 Staghorn Court
Alpharetta, GA 30004

Attn: Andrew Brabham
770-751-7599
abrabham@tdfarrell.com

Re: Aldi #0639 Tampa, FL

Plumbing SCOPE OF WORK

Plumbing REV-1 Plans, P-000, P-001, P-101, PD-101, P-102, P-201, P-301, P-401,
Dated 06-13-25.

Inclusions

2 DPCO-2
1 EWC
1 EWH-1C
1 EWH-2
1 EWH-3
1 EWH-4
2 FD-1
1 FD-2
20 HD-1
2 LAV-A
1 RH-1.
1 SK-A
2 UR-A
2 WC-A.
2 WH-1.
2 WPCO
Hook up plumbing for fixtures provided by others.

Material

DWV piping to be SCH 40 PVC pipe and fittings. Domestic water piping to be CPVC pipe and fittings. Domestic Hot water piping to be insulated. Demo as needed.

Exclusions

• Permits
• Grease Traps
• Any dewatering
• Any Roof work of any kind
• Any Structural work of any kind.
• Any Housekeeping pads.
• Any Ceiling work of any kind.
• Any Fireproofing
• Any X-ray of any kind
• Any Painting.
• Any Concrete work of any kind
• Any Demolition work.
• Composite Labor, Broom sweep of floors & Dumpster charges.
• Drywall access doors for ceilings or walls.
• Protection of Fixtures & Equipment following installation.
• Buy America Act domestic requirement.
• Overtime, premium time, & shift work.
Note: Opening of ceilings, walls, and floors by others.
This Proposal is Firm for thirty (30) Days.

Price

$80,300.00

Add for Camera/Jetting @ PER DAY

$4,500.00

Add for Cameraing only @ PER DAY

$3,500.00

Respectfully,

David Crosby, Plumbing Estimator