September 12, 2025

T.D. Farrell Construction, Inc.
530 Staghorn Court Job: Aldi Store #0168
Alpharetta, GA 30004 North Port, FL

Attn: Andrew Brabham
770-751-7599
abrabham@tdfarrell.com

Plumbing SCOPE OF WORK - Revised

2 WC-A ADA Water Closets Kohler with seat and supplies.
2 UR-A Urinals Kohler with flush valve and supplies.
2 LAV-A Lavatory Kohler with faucet and supplies.
1 SK-A ADA Sink Furnished by owner. Installed by plumber.
1 GD-A Garbage Disposal Insinkerator 79848-ISE.
1 MB-A Mop Basin Fiat MSB3624100.
3 EWH-1 Electric Water Heaters Eemax EMT6.
3 EWH-2 Electric Water Heaters Eemax AM05240T.
1 DW-A Dishwasher Furnished by owner. Installed by plumber
1 DF-A Drinking Fountain with bottle filler Elkay LZSTL8WSLP.
2 WH-A Wall Hydrants Woodford B65C-CC.
1 RH-A Roof Hydrant Woodford SRH-MS.
2 FD-1 Floor Drains Zurn ZN415-3NL-6B-P
1 FD-2 Floor Drain Zurn Z415-4NL-7N-P.
1 FD-3 Floor Drain Zurn ZN415-3NL-6B-P.
19 HD-1 Hub Drains
3 RD-1 Roof Drains Zurn ZC125-4IP-90.
2 DPCO-1 Floor Cleanouts Zurn Z1400-4NL-BP.
4 DPCO-2 Floor Cleanouts Zurn ZN1400-4NL-BP.
3 WPCO Wall Cleanouts Zurn Z1446-2NH-BP.
2 FCO Floor Cleanouts Zurn Z1402-4NL.
1 SP-1 Sump Pump Liberty D3648LSG203.
1 ST-5 Expansion Tank

Material

All waste and vent piping to be SCH 40 PVC pipe and fittings.
All water piping to be CPVC pipe and fittings.
All hot water piping to be Type L copper pipe and fittings.
All water piping to be Armaflex insulated.

Conditions

Any permits and/or fees to be paid by others. Price is good for 30 days. After 30 days, if our prices increase, we will increase yours accordingly. Upon receiving a Letter of Intent, contract to follow within 15 days, to hold pricing. Price reflects work to be done Monday - Friday 7:00am - 3:30pm. No additional work to be performed without an approved change order. Any breaking and/or patching of floors or walls are not included in this scope of work. Removal of
excess excavation materials of any type is not included in this scope of work. Water, quicksand, rock, environmental contamination, asbestos, or other unforeseen obstructions or subsurface soil conditions will constitute conditions above and beyond this scope of work. Additional cost in forementioned conditions shall be agreed upon in writing between Brighter Utilities Tampa Plumbing LLC dba B&B Professional Plumbing and Air and the General Contractor.

Late Payments

Payments are to be made in monthly draws within 29 days of each monthly request. In the event any payments are not made when due, including final payment, the General Contractor shall be liable for interest in an amount to 1.5% per month or the maximum legal rate permitted by law, accruing from the date the last payment became overdue.

Back Charges

No back charges or claims by the General Contractor shall be valid unless agreed to in writing by Brighter Utilities Tampa Plumbing LLC dba B&B Professional Plumbing and Air before the “back charge work” is executed. In the case of Brighter Utilities Tampa Plumbing LLC dba B&B Professional Plumbing and Air’s failure to meet any requirement of the subcontract agreement, the General Contractor shall notify Brighter Utilities Tampa Plumbing LLC dba B&B Professional Plumbing and Air of such default in writing and allow Brighter Utilities Tampa Plumbing LLC dba B&B Professional Plumbing and Air reasonable time to correct any
deficiency.

Total Contract Price

SEVENTY-NINE THOUSAND ONE HUNDRED FIFTY DOLLARS AND NO/100

$79,150.00

Respectfully,

Tim Mitchell
Project Manager
tim@bbproplumbing.com

 